top of page
Search

Build Thread Part 18

As of September 2023 - Leading into the winter of 2023 into 2024 I had plans to add some more carbon to the car and bring the cage to the front of the car, making it a full 6 point cage, but had to put those plans on hold until the next year, due to parts delays. The plan to build the engine, transmission, and fueling system was still happening though. I planned to drop off the car at Redline Motorworks in Maryland at the end of November for Brian and his guys to get to work. All of the parts have been acquired, we will be doing a sleeved block with ARP625 head studs as well, that work being performed by Force Fed Engineering (FFE) out of New York. My goal with the engine build is to build the car to the point where if I want more power in the future, essentially all that will need to be done will be to swap the turbo, change injectors, and re-tune. I have published a video on my YouTube channel going over all of the parts that I’ve acquired and will be putting on the car as a part of the engine build this winter if you want to check it out.


 
 
 

Recent Posts

See All

Build Thread Part 23

From October 2024 - So my track event at VIR on the weekend of the 10th & 11th was cancelled to the remnants of hurricane Debbie that hit...

Build Thread Part 22

A small update from August of 2024 - In preparation for VIR next weekend, the car got some custom ducting for the factory auxiliary...

コメント


©2023 Flom Motorsports.

bottom of page